F09 configured supporting document
Rotary Signage Design Guide
A controlled, editable working derivative for M-T1-CP-10-SD-01. Complete local facts, approvals and operational evidence before use.
Release truth. This file is configured for substantive review. It is not approved for public distribution or operational use. Local law, insurance, safeguarding, accessibility, privacy, brand, rights and accountable-owner checks remain mandatory.
M-T1-CP-10-SD-01 — Rotary Signage Design Guide
Release control
| Field | Controlled value |
|---|
| Status | REVIEW — configured derivative; site, brand, competent technical and production approvals required |
| Supporting-document code | M-T1-CP-10-SD-01 |
| Exact derivative title | Rotary Signage Design Guide |
| Source initiative | M-T1-CP-10 - Rotary Signage Upgrade Program |
| Source initiative code | M-T1-CP-10 |
| Source initiative title | Rotary Signage Upgrade Program |
| Initiative disposition | Canonical retained with new title |
| Canonical parent | M-T1-CP-10 - Rotary Signage Lifecycle Program |
| Canonical parent code and title | M-T1-CP-10 - Rotary Signage Lifecycle Program |
| Named overlay or migration label | Upgrade Project remains a named delivery phase |
| Redirect or tombstone route | Permanent title alias from Rotary Signage Upgrade Program to M-T1-CP-10 — Rotary Signage Lifecycle Program; retain M-T1-CP-10-SD-01 as the stable asset code |
| Family master | Playbook_F09_Display_Signage_Exhibition_Design_Master.md |
| Family / master version | F09 / 1.0 |
| Recorded master SHA-256 | d2be357a167b8d1f385b394e77dd7e277c91af936e325de05c9edfa914b50b4e |
| Authoritative index | Playbook_Supporting_Documents_Master_Index.md v1.1 |
| Configured master variant | Section 20 — M-T1-CP-10-SD-01 Rotary Signage Design Guide overlay |
| Derivative version | v0.1 |
Adaptation note
Use for the upgrade phase within the Rotary Signage Lifecycle Program. Classify each sign as promotional, directional, commemorative, permanent or dedication before design because brand, licensing and site approvals differ. Survey viewing direction, speed, distance, obstruction, night conditions, glare, vegetation and maintenance access. Obtain every landowner, council, planning, heritage, road, building, electrical, engineering, licensing and installation approval required for the specific site.
Instructions
- Create one site record per sign. Do not reuse another site’s dimension, fixing, wind, foundation, electrical or approval assumptions.
- Verify the sign purpose and the minimum message readable safely at the observed speed/distance.
- Use current official identity and approved layouts; never reuse traced wheels, retired artwork or invented lockups.
- Separate identity, descriptive text, project/dedication wording and partner credit. Do not alter the official mark.
- Use supplier and competent site reviewers for material, structure, fixings, foundation, illumination, electrical and vandal-resistance decisions.
- Record asset ID, artwork/version, approvals, installer, condition, inspection frequency, content owner and removal responsibility before installation.
- This guide does not certify engineering, structure, wind, electrical, weather, fire, road or life-safety performance.
Controlled fields
| Field | Completion instruction | Evidence |
|---|
| {{SIGN_NAME}} / {{SIGN_CLASS}} | Enter title and Promotional / Directional / Commemorative / Permanent / Dedication class. | Lifecycle brief |
| {{RESPONSIBLE_ENTITY}} | Enter accountable club/District entity. | Initiative approval |
| {{SITE_LOCATION}} / {{LANDOWNER}} | Enter precise site, ownership/control and notice contact. | Site/landowner record |
| {{VIEWING_SURVEY}} | Record directions, speeds, distances, angles, obstructions, light/night/glare and vegetation. | Site survey |
| {{ESSENTIAL_MESSAGE}} / {{CONTACT_ROUTE}} | Enter minimum safely readable copy and durable contact/fallback. | Content/site approval |
| {{SIGN_DIMENSIONS}} / {{MOUNTING_HEIGHT}} | Enter competent/supplier/site-approved finished size and placement. | Dimensioned approved drawing |
| {{MATERIAL_FINISH}} / {{SERVICE_LIFE}} | Enter evidenced substrate, finish, environment and intended life. | Supplier evidence |
| {{STRUCTURE_FIXING_FOUNDATION}} | Enter only competent-review design/reference; never self-calculate. | Engineer/installer/site approval |
| {{ILLUMINATION_ELECTRICAL}} | Enter approved lighting/electrical specification or None. | Electrical/site approval |
| {{VANDAL_MAINTENANCE_ACCESS}} | Enter protection, cleaning, inspection and safe maintenance route. | Lifecycle/maintenance plan |
| {{SITE_APPROVALS}} | List landowner/council/planning/heritage/road/building/licensing approvals and conditions. | Approval register |
| {{INSTALLER_AND_HANDOVER}} | Enter competent installer, method statement and acceptance evidence. | Contract/handover record |
| {{ASSET_ID}} / {{INSPECTION_FREQUENCY}} / {{REMOVAL_OWNER}} | Enter lifecycle identifiers and owners. | Asset register |
| {{ACCESSIBLE_ALTERNATIVE}} | Enter equivalent close-read/digital/contact route where sign cannot carry detail. | Accessibility review |
| {{CONTENT_REVIEW_DATE}} | Enter claim, contact, rights and brand recheck date. | Content owner approval |
Configured sign design and lifecycle specification
Classification and purpose
| Decision | Entry |
|---|
| Sign name/class | {{SIGN_NAME}} / {{SIGN_CLASS}} |
| Site/landowner | {{SITE_LOCATION}} / {{LANDOWNER}} |
| Accountable identity | {{RESPONSIBLE_ENTITY}} |
| Essential message | {{ESSENTIAL_MESSAGE}} |
| Durable contact/fallback | {{CONTACT_ROUTE}} |
| Accessible alternative | {{ACCESSIBLE_ALTERNATIVE}} |
Site and viewing survey
{{VIEWING_SURVEY}}
| Factor | Verified condition | Design consequence | Reviewer/evidence |
|---|
| Viewing direction and decision point | | | |
| Pedestrian/vehicle movement and safe reading time | | | |
| Furthest/closest distance and angle | | | |
| Obstructions/vegetation/future growth | | | |
| Day/night/uneven light, reflection and glare | | | |
| Accessible approach or alternative | | | |
| Maintenance access and traffic/public control | | | |
Do not add copy that cannot be read safely in the verified context.
Identity and copy zones
- Official identity: authentic {{RESPONSIBLE_ENTITY}} mark in its own clear-space zone.
- Primary sign function: {{ESSENTIAL_MESSAGE}} appropriate to {{SIGN_CLASS}}.
- Direction/context: only essential destination, arrow, dedication or project wording.
- Partner/dedication credit: separate approved zone and relationship wording.
- Durable trust: {{CONTACT_ROUTE}}, asset {{ASSET_ID}} and restrained lifecycle metadata.
Official brand asset lock
- Use the verified supplied current official club/District mark. Never generate, substitute, redraw, trace, recolour, stretch, crop, rearrange or create a local lockup.
- Original effective mark: 763 × 284 pixels, approximately 64.6 × 24.0 mm at 300 ppi. Transparent padding is accounted for; the 763:284 proportion is locked in artwork, proofs and fabrication files.
- Preserve current clear space. Do not place descriptive/dedication text inside the logo or use the Mark of Excellence as a substitute identity.
- Register original filename, authorised source, checksum/version, colour form and approved sign use.
Dimensions, material and competent technical review
| Specification | Approved value / evidence |
|---|
| Finished dimensions | {{SIGN_DIMENSIONS}} |
| Mounting/reading height | {{MOUNTING_HEIGHT}} |
| Substrate, finish, edges and service life | {{MATERIAL_FINISH}} / {{SERVICE_LIFE}} |
| Structure, posts, fixings and foundation | {{STRUCTURE_FIXING_FOUNDATION}} |
| Illumination/electrical | {{ILLUMINATION_ELECTRICAL}} |
| Vandal resistance/cleaning/maintenance access | {{VANDAL_MAINTENANCE_ACCESS}} |
| Competent installer/handover | {{INSTALLER_AND_HANDOVER}} |
No wind rating, ballast, footing, fixing load, electrical/weather/fire rating or structural assurance may appear without competent evidence.
Approval register
| Approval | Authority/competent person | Evidence/reference | Conditions | Expiry | Owner |
|---|
| Landowner/site | | | | | |
| Council/planning/heritage/road/building | | {{SITE_APPROVALS}} | | | |
| Structural/foundation/installation | | | | | |
| Electrical/illumination | | | | | |
| Brand/trademark/dedication | | | | | |
| Accessibility | | | | | |
Supplier proof and fabrication handoff
| Item | Required evidence |
|---|
| Dimensioned artwork/drawing | Finished size, safe zones, posts/fixings, orientation and site elevation agree |
| Colour/finish sample | Official colours and contrast checked in expected light |
| Full-size critical proof | Mark, primary copy, arrow/dedication text and contact tested at distance |
| Fabrication file | Supplier-approved colour/profile/fonts/overprint/cut/drill layers |
| Material certificates | Only claims required/approved for the site |
| Installation method | Competent approved sequence, area control and handover |
Lifecycle record
| Asset ID | Artwork version | Install date | Approvals | Installer | Condition | Inspection frequency | Content owner/review | Removal owner/trigger |
|---|
| {{ASSET_ID}} | | | {{SITE_APPROVALS}} | {{INSTALLER_AND_HANDOVER}} | A/B/C/D | {{INSPECTION_FREQUENCY}} | {{CONTENT_REVIEW_DATE}} | {{REMOVAL_OWNER}} |
Acceptance checks
- [ ] Canonical lifecycle title and Upgrade Project alias are recorded.
- [ ] Sign class is explicit and its brand/site/legal approval path is appropriate.
- [ ] Site/viewing survey covers direction, speed, distance, angle, obstructions, night, glare, vegetation and maintenance.
- [ ] Message can be read safely and does not overload the verified context.
- [ ] Official mark provenance is recorded; 763 × 284 effective dimensions, transparent padding and aspect lock are preserved.
- [ ] Identity, descriptive/dedication text and partner credit remain separate.
- [ ] Dimensions, materials, finish, structure, fixings, foundation, illumination and maintenance have supplier/competent approval.
- [ ] Landowner and all required council/planning/heritage/road/building/licensing approvals are complete.
- [ ] Full-size proof passes distance, contrast, glare, night and accessible-alternative review.
- [ ] Installation method protects public routes, services, exits and workers and has formal handover.
- [ ] Asset/version/installer/approval/condition/inspection/content/removal records are complete.
- [ ] No unsupported structural, wind, electrical, weather, fire or life-safety claim appears.
Review record
| Review domain | Reviewer | Outcome / required change | Date |
|---|
| Content/sign function | | | |
| Brand/trademark/dedication | | | |
| Accessibility | | | |
| Landowner/statutory approvals | | | |
| Structural/electrical/installation | | | |
| Supplier proof/fabrication | | | |
| Lifecycle approval | | | |