Rotary District 9510
REVIEW EDITION
F01 configured supporting document

Stall Setup Checklist

A controlled, editable working derivative for M-T1-CP-24-SD-01. Complete local facts, approvals and operational evidence before use.

Release truth. This file is configured for substantive review. It is not approved for public distribution or operational use. Local law, insurance, safeguarding, accessibility, privacy, brand, rights and accountable-owner checks remain mandatory.

M-T1-CP-24-SD-01 — Stall Setup Checklist

F01 configured review derivative

Status: REVIEW - configured working derivative; not approved for event delivery or public distribution Theme: Attraction and Visibility Sub-theme: Community Presence and Visibility Index authority: Supporting Documents Master Index and Release Manifest v1.1, issued 2 August 2026


1. Controlled identity and migration metadata

Controlled fieldConfigured entry
Supporting-document codeM-T1-CP-24-SD-01
Exact derivative titleStall Setup Checklist
Exact supporting-document titleStall Setup Checklist
StatusREVIEW - configured working derivative; local facts, approval, rendering and release evidence remain required
Family / master versionF01 - Event and Activation Planning / 1.0
Recorded master SHA-256bac1b73d70b763d279ffaeb8502b398eb0ea059303afce5bff2a1f585eabb0ee
Authoritative indexPlaybook_Supporting_Documents_Master_Index.md v1.1, issued 2 August 2026
Configured master variantM-T1-CP-24-SD-01 - Stall Setup Checklist; F01 Section 23 mandatory overlay incorporated in full
Source initiativeM-T1-CP-24 - Rotary Outdoor Information Stall
Source initiative codeM-T1-CP-24
Source initiative titleRotary Outdoor Information Stall
Source initiative code/titleM-T1-CP-24 - Rotary Outdoor Information Stall
Initiative dispositionAbsorbed as overlay
Canonical parentM-T1-CP-14 - Pop-Up Rotary Activation System
Canonical parent code/titleM-T1-CP-14 - Pop-Up Rotary Activation System
Canonical parent code and titleM-T1-CP-14 - Pop-Up Rotary Activation System
Named overlay or migration labelOutdoor Market or Festival Stall
Redirect or tombstone routePermanent overlay alias from M-T1-CP-24 - Rotary Outdoor Information Stall to M-T1-CP-14 - Pop-Up Rotary Activation System; retain stable derivative code M-T1-CP-24-SD-01.
Supporting-document migration controlRetain both CP-24 codes as setup-and-roster overlays and record CP-14 as canonical parent.
Family masterPlaybook_F01_Event_and_Activation_Planning_Master.md
Family master filePlaybook_F01_Event_and_Activation_Planning_Master.md
Derivative version0.1 REVIEW
Prepared date2 August 2026
Adaptation noteThe complete F01 operating controls are configured below for Rotary Outdoor Information Stall. The mandatory Outdoor Market or Festival Stall requirements are embedded as auditable tasks, risks, resources and measures rather than left as a pointer to the family master.

2. Instructions for the review copy

  1. Replace every blank with an event-specific fact, owner, date, threshold or evidence location.
  2. Keep the exact code, title, source initiative, disposition, canonical parent and overlay metadata unchanged.
  3. For a control that genuinely does not apply, enter Not applicable, the reason, the decision owner and the acceptance date. Do not delete the control.
  4. Confirm local requirements with the venue, landowner, organiser, insurer, council, safeguarding lead and other competent authorities relevant to the actual activity.
  5. Do not promote, spend, contract or open to the public until the go gate and pre-event approvals are complete.
  6. Retain the approved working copy, permissions, financial record, incidents, follow-up record and debrief under the approved records policy.
  7. This planning tool is not legal, medical, engineering, food-safety or insurance advice. Australian requirements vary by jurisdiction, site and activity.

Checklist key: [ ] open; [x] complete and evidenced; N/A accepted with reason and owner.

3. Working document control

Operational fieldEntry
Event or activation name______________________________
Club or delivery unit______________________________
Event lead______________________________
Accountable sponsor______________________________
Safety and safeguarding lead______________________________
Privacy and registration lead______________________________
Version0.1 REVIEW / update before approval
Prepared by and date______________________________
Review meeting date______________________________
Approved dateNot approved
Next review date______________________________
Working-file location______________________________
Approved budget record______________________________
Final event record location______________________________

Change record

VersionDateChangeAuthorApprover
0.1 REVIEW2 August 2026First configured derivative for substantive reviewCodex working teamPending
________________________________________________________________________________

4. Configured operating profile

Planning choiceConfigured starting point to confirm
FormatWeather-ready outdoor information stall arranged in distance-message, conversation-proof and assisted-next-step layers
Recommended lead time6-8 weeks or the host organiser's earlier deadline
Planned durationFull approved operating period plus setup, rostered breaks, pack-down and final site sweep
Primary purposeGive outdoor-event visitors a clear Rotary message, useful proof and an assisted path to one relevant local action.
Primary audiencePeople attending the host market, festival or outdoor site
Secondary audienceNearby exhibitors, local residents and potential volunteers
Partner or stakeholder audienceHost organiser, site manager and approved local project-content owners
Primary participant next stepAsk a question, request assisted follow-up or accept one dated local opportunity
Primary audience promiseSee the local impact, ask a real person and take one practical next step.
Critical approval focusHost rules, footprint, shade, wind exposure, ground surface, operating period, emergency routes and overnight-storage limits
Critical risk focusWind, unstable furniture, improvised tie-downs, weather or stall layout creates a trip or access hazard
Key configured resource setDistance-message sign; proof stories; assisted action point; rated weights; stable furniture; weather protection; roster kit; final sweep and asset list
Related controlled interfacesM-T1-CP-24-SD-02 Volunteer Roster Template; authorised F03 financial record where expenditure applies

Related interfaces are inputs or records, not substitutes for the controls in this derivative.

5. Mandatory configured adaptation checklist

Every row below is mandatory for this exact code. Record an owner, due date and evidence before approval.

Mandatory configured requirementDoneOwner and due dateEvidence or accepted decision
Confirm the host event or site rules, footprint, shade, wind exposure, ground surface, operating period and overnight-storage limits.[ ]____________________________________
Use rated weights and stable furniture; never improvise tie-downs or block accessible paths and emergency routes.[ ]____________________________________
Arrange the stall in three layers: distance message, conversation proof and assisted next step.[ ]____________________________________
Provide weather protection for people, paper, electronics and display assets, with a defined closure threshold.[ ]____________________________________
Roster enough members for active hosting, breaks, setup and pack-down.[ ]____________________________________
Complete a final sweep for data, waste, pegs, weights, signs and trip hazards before site handback.[ ]____________________________________

6. Event decision brief

DecisionConfigured record
Community need or opportunityGive outdoor-event visitors a clear Rotary message, useful proof and an assisted path to one relevant local action. Confirm the local evidence or partner request: ______________________________
Why Rotary is a credible contributor or convenerCurrent local service, trusted relationships and members able to connect people to the stated next step. Local evidence: ______________________________
Primary purpose categoryAwareness / Volunteering / Community connection
Desired change for participantsParticipants understand the offer, have a useful interaction and can act on the configured next step: Ask a question, request assisted follow-up or accept one dated local opportunity.
Desired change for community or partnerThe activity creates verified engagement and owned follow-through, not visibility alone.
Why this format is appropriateConfirm why weather-ready outdoor information stall arranged in distance-message, conversation-proof and assisted-next-step layers is more useful than a meeting, email or existing initiative: ______________________________
Decision if the event does not proceedCancel / Defer / Merge / Use a lower-risk format

Outcomes and thresholds

OutcomeEvidence or measureTarget or decision thresholdOwner
Relevant people engage meaningfullyMeaningful hosted conversations____________________________________
Participants accept an appropriate next stepAssisted next steps accepted____________________________________
Rotary fulfils its promises and closes controlsRoster, asset and site handback obligations completed____________________________________

Explicit non-goals

Scope boundary

In scopeOut of scope
Planned delivery of the configured format inside the approved site, time and operating conditionsUnapproved activity, structures, trading, collection, advice or data use
Current, verified stories and respectful two-way engagementOutdated claims, generic membership pressure or unsupported partner claims
Consent-based next steps with named owners and due datesAdding people to future communications without a clear affirmative choice

7. Audience journey and experience

Journey stageRequired configured experienceOwnerEvidence or test
DiscoverOne clear promise: See the local impact, ask a real person and take one practical next step.__________________Five-second comprehension test
DecideDate, time, place, duration, cost, access and participation conditions are complete__________________Independent invitation check
Arrive or registerLow-friction welcome with paper or assisted fallback__________________Arrival walkthrough
OrientPurpose, boundaries, amenities, safety and help contact are clear in the first five minutes__________________Host rehearsal
ParticipateInteraction is useful, inclusive and within the approved scope__________________Observation plan
Choose a next stepAsk a question, request assisted follow-up or accept one dated local opportunity__________________Tested action route
Follow upPromised action is consent-based, owned, dated and recorded__________________Follow-up queue

8. Go / modify / stop gate

Gate questionYesNoN/AEvidence or action
Purpose and expected community value justify the resources.[ ][ ][ ]__________________
Event lead and one accountable sponsor are confirmed.[ ][ ][ ]__________________
Host rules, footprint, shade, wind exposure, ground surface, operating period, emergency routes and overnight-storage limits.[ ][ ][ ]__________________
Insurance applicability, exclusions and evidence requirements are confirmed.[ ][ ][ ]__________________
Wind, unstable furniture, improvised tie-downs, weather or stall layout creates a trip or access hazard is controlled to an accepted level.[ ][ ][ ]__________________
Accessibility barriers are addressed or clearly communicated.[ ][ ][ ]__________________
Safeguarding controls are confirmed for the expected audience and activity.[ ][ ][ ]__________________
Food, alcohol, gas, electrical, traffic, structure and public-land triggers are resolved.[ ][ ][ ]__________________
Budget and spending authority are approved.[ ][ ][ ]__________________
Brand, image rights, privacy and data controls are ready.[ ][ ][ ]__________________
The team can fulfil every promised follow-up by its due date.[ ][ ][ ]__________________

Decision: Go / Modify / Defer / Stop Decision owner and date: ______________________________ Conditions: ____________________________________________________________

9. Approvals and external requirements

Approval or confirmationConfigured triggerOwnerAuthority or sourceEvidence locationDueStatus
Club or committee approvalAll delivery__________________Club governance____________________________Open
Site, venue, landowner or organiser consentAny use of a site or host event__________________Current written site authority____________________________Open
Variant-specific operating approvalHost rules, footprint, shade, wind exposure, ground surface, operating period, emergency routes and overnight-storage limits__________________Relevant competent authority____________________________Open
Council or land-manager requirementsPublic land, structures, trading, signs, noise or changed access__________________Relevant authority____________________________Open / N/A
Insurance confirmationPublic activity, volunteers, equipment, suppliers or exhibitors__________________Authorised insurance contact____________________________Open
Food requirementsNot applicable unless the stall includes authorised food or samples; document that separate control path.__________________Venue, organiser and relevant authority____________________________Open / N/A
SafeguardingUse observable public engagement, apply image and lost-person procedures, and do not collect children's details.__________________Club or district safeguarding lead____________________________Open / N/A
Traffic, pedestrian, structure, gas and electrical controlsWhen triggered by site or equipment__________________Site or competent provider____________________________Open / N/A
Brand artwork approvalAll new public-facing Rotary or district artwork__________________Authorised brand reviewer____________________________Open
Photography and story permissionsIdentifiable people, personal stories or partner material__________________Rights and consent owner____________________________Open / N/A
Data and privacy reviewRegistration, enquiry, referral or follow-up data__________________Privacy or data owner____________________________Open / N/A

10. Delivery timeline

TimingMinimum configured outputOwnerDone
6-8 weeks or the host organiser's earlier deadline beforePurpose, sponsor, site path, budget range, audience and partners__________________[ ]
8-6 weeks before or proportionate equivalentSite terms, insurance, approval path, safeguarding and access review__________________[ ]
6-4 weeks beforeProgram, suppliers, designs, data flow and configured resources__________________[ ]
4-2 weeks beforePromotion, roster, run sheet, accessibility information and bookings__________________[ ]
14-7 days beforeFinal site review, risks, proofs, tested action routes and briefing pack__________________[ ]
72 hours beforeWeather, attendance, supplier, contact and contingency decision__________________[ ]
24 hours beforePack, charge, print, test, confirm handovers and publish changes__________________[ ]
Delivery dayBrief, inspect, deliver, monitor, record, close and hand back__________________[ ]
Within 24 hoursIncident closure, urgent promises, thanks and asset check__________________[ ]
Within 2 business daysConsent-based follow-up, referrals and partner response__________________[ ]
Within 5 business daysFinance close, measures, debrief and records filing__________________[ ]
Within 14 daysImprovement and repeat, modify or stop decision__________________[ ]

11. Responsibility and contacts

WorkstreamAccountableResponsibleConsultedInformedEvent-day contact
Overall delivery and stop decision__________________________________________________________________________________________
Program and participant experience__________________________________________________________________________________________
Site, equipment and configured resources__________________________________________________________________________________________
Safety, first aid and incidents__________________________________________________________________________________________
Safeguarding and accessibility__________________________________________________________________________________________
Volunteers, partners or contributors__________________________________________________________________________________________
Communications, brand and permissions__________________________________________________________________________________________
Registration, privacy and follow-up__________________________________________________________________________________________
Finance, procurement and close-out__________________________________________________________________________________________
Critical contactName or organisationPrimary contactBackup
Venue, site or organiser______________________________________________________
Emergency servicesImmediate danger in Australia000__________________
First aider______________________________________________________
Safeguarding escalation______________________________________________________
Supplier or technical lead______________________________________________________
Club or district escalation______________________________________________________

12. Site, access and inclusion review

Site factConfirmed record
Address and approved operating area______________________________
Site manager and event-day contact______________________________
Bump-in, opening, closing, bump-out and handback times______________________________
Loading, storage, power, water and internet______________________________
Public transport, parking and accessible drop-off______________________________
Toilets, handwashing, seating and rest options______________________________
First-aid point, emergency access and assembly point______________________________
Weather shelter or approved alternate______________________________

Access limitations, mitigation and acceptance: ________________________________________________

13. Safety, insurance, food and safeguarding

Hazard or scenarioWho may be affectedControls before openingMonitorStop or escalate trigger
Wind, unstable furniture, improvised tie-downs, weather or stall layout creates a trip or access hazardParticipants, team and public________________________________________________Rated weighting, stable furniture, weather protection, accessible route or emergency clearance cannot be maintained
Slips, trips, loading and manual handling__________________________________________________________________Unsafe route or task
Weather, heat, UV, wind or rain__________________________________________________________________Pre-agreed threshold reached
Electrical, gas, power or equipment failure__________________________________________________________________Isolation or safe fallback unavailable
Vehicle, pedestrian, crowd or queue interaction__________________________________________________________________Safe separation cannot be maintained
Medical event, conflict or unsafe conduct__________________________________________________________________Beyond volunteer competence or immediate danger
Child or vulnerable-person concern__________________________________________________________________Safeguarding path activated
Food, allergen, hygiene or waste issue__________________________________________________________________Service control fails
Data, device or paper-record loss__________________________________________________________________Loss or unauthorised access suspected
Activity-specific hazard____________________________________________________________________________________

Evidence locations and stop-authority names: ________________________________________________

14. Program and run sheet

Relative timeClock timeConfigured activityParticipant experience or messageLeadEquipment or cueFallback
Opening -120 min______Site access and condition checkApproved, safe and accessible operating area______Site recordEscalate before unloading
Opening -90 min______Setup: Distance-message sign; proof stories; assisted action point; rated weights; stable furniture; weather protection; roster kit; final sweep and asset listUnsafe setup area remains separated from public______Pack listReduced safe configuration
Opening -45 min______Test access, information, data and equipmentEvery public touchpoint works______Test scriptPaper or non-powered mode
Opening -30 min______Team safety, scope, access and safeguarding briefTeam understands boundaries and escalation______Briefing cardDelay if critical role absent
Opening______Welcome and configured delivery beginsSee the local impact, ask a real person and take one practical next step.______Opening cueShort-form opening
Main activity______Weather-ready outdoor information stall arranged in distance-message, conversation-proof and assisted-next-step layersRespectful engagement and relevant next step______Configured materialsSimplify without weakening controls
Midpoint______Welfare, stock, queue and quality resetConsistent, accessible experience______Reset listRotate team or reduce scope
Close -15 min______Final next-step invitationAsk a question, request assisted follow-up or accept one dated local opportunity______Follow-up routeAssisted response
Close______Thank participants and explain follow-upNo unowned promise______Closing cueDirect contact card
Close +15 min______Secure data, cash and sensitive materialRecords protected before pack-down______Secure containerDirect transfer to owner
Close +60 min______Asset check, site handback and hot debriefSafe close and accepted handback______Handover recordRemain until issue assigned

15. Resources, procurement and finance

ResourceQuantitySourceOwnerReady dateTransport or storageReturn or disposal
Distance-message sign; proof stories; assisted action point; rated weights; stable furniture; weather protection; roster kit; final sweep and asset list______________________________________________________________________________________
Approved signs and current project material______________________________________________________________________________________
Registration, privacy and paper fallback material______________________________________________________________________________________
Accessibility, seating or assisted-participation aids______________________________________________________________________________________
Safety, first-aid and weather equipment______________________________________________________________________________________
Cleaning, waste and asset-return supplies______________________________________________________________________________________

Use M-T1-CP-01-SD-03 Event Budget Template as the F03 family financial record unless the controlled index issues a replacement. Do not maintain competing totals here.

Financial controlRecord
Approved budget link or file______________________________
Finance owner and spending authority______________________________
Maximum commitment and contingency authority______________________________
Income, donation, sponsorship or cashless handling______________________________
Supplier payment and receipt route______________________________
Reconciliation due date______________________________

16. Brand, imagery, registration and privacy

Data elementOperational needAccess ownerRetention or deletion ruleSecure location
Name________________________________________________________________________
Contact method________________________________________________________________________
Attendance, enquiry or role________________________________________________________________________
Access or dietary information________________________________________________________________________
Future-contact preferenceSeparate affirmative choice only______________________________________________________
Other essential data________________________________________________________________________

17. Communications plan

Primary audience promise: See the local impact, ask a real person and take one practical next step. One-sentence description: Give outdoor-event visitors a clear Rotary message, useful proof and an assisted path to one relevant local action. Primary call to action: Ask a question, request assisted follow-up or accept one dated local opportunity Accessibility contact: ______________________________ Authorised media contact: ______________________________

AudienceChannel or assetPurposeOwnerRelease dateApprovalMeasure
Intended participants__________________Invite and inform________________________________________________
Members and volunteers__________________Recruit and brief________________________________________________
Partners or contributors__________________Confirm duties and boundaries________________________________________________
Site, organiser or authorities__________________Confirm operations and compliance________________________________________________
Registered or interested people__________________Confirm access, timing and changes________________________________________________
Post-event audience__________________Thank, report and offer the agreed next step________________________________________________

18. Contingencies and decision triggers

ScenarioPre-agreed triggerResponseDecision ownerCommunication route
Variant-critical failureRated weighting, stable furniture, weather protection, accessible route or emergency clearance cannot be maintainedModify, pause, relocate or stop; do not improvise outside approval____________________________________
Severe weather or unsafe site__________________Move, modify, delay or cancel under official and site advice____________________________________
Critical team absence__________________Use reduced safe format or defer____________________________________
Low or excessive attendance__________________Adjust scale, meter access or use approved overflow____________________________________
Power, internet or equipment failure__________________Use tested paper or non-powered fallback____________________________________
Medical, safety or safeguarding incident__________________Stop affected activity; use trained response; call 000 for immediate danger____________________________________
Food or allergen concern__________________Stop service, isolate affected items and use authorised response____________________________________
Data, form or device loss__________________Secure access, preserve facts and escalate____________________________________
Aggressive or unsafe conduct__________________Use site security or emergency response____________________________________
Venue, speaker, supplier or partner unavailable__________________Use approved alternate, revise scope or cancel____________________________________

19. Team briefing and opening authorisation

Every event-day team member must be able to state:

Brief lead, time and attendance record: ________________________________________________

Opening authorised by, time and conditions: ________________________________________________

20. Follow-up and close-out

Person or organisationConsent and contextPromised actionOwnerDueDoneRecord location
__________________________________________________________________________________[ ]__________________
__________________________________________________________________________________[ ]__________________
__________________________________________________________________________________[ ]__________________

21. Measures, decision and learning

DimensionConfigured measureTargetActualEvidenceInterpretation
ReachRelevant participants or meaningful passers-by____________________________________________
EngagementMeaningful hosted conversations____________________________________________
ConversionAssisted next steps accepted____________________________________________
Follow-throughRoster, asset and site handback obligations completed____________________________________________
InclusionAccess needs met and barriers reported____________________________________________
SafetyIncidents, near misses and control failures0 unresolved________________________________________
Team healthFilled roles, breaks and volunteer feedback____________________________________________
FinancialNet cost and material variance________F03 record__________________
ReputationVerified feedback, media or complaints____________________________________________

Outcome decision and reason: Repeat unchanged / Repeat with modification / Scale / Merge / Stop ________________________________________________________________________________

Review promptEvidence-based lessonControlled change proposedOwnerDue
What created the most community value?________________________________________________________________
Where did the participant journey fail or slow?________________________________________________________________
Which safety, access or safeguarding control needs improvement?________________________________________________________________
Which message, interaction and next step worked best?________________________________________________________________
Which promise, cost or resource assumption was difficult?________________________________________________________________

22. Sign-off and review-release gate

Pre-event approval

RoleNameDecisionDateRecorded approval location
Event lead__________________Ready / Ready with conditions / Not ready____________________________
Safety and safeguarding lead__________________Ready / Ready with conditions / Not ready____________________________
Finance or delegated approver__________________Approved / Not approved____________________________
Accountable sponsor__________________Go / Modify / Defer / Stop____________________________

Post-event closure

RoleNameClosure statementDateRecord location
Event lead__________________Delivery and site records complete____________________________
Safety and safeguarding lead__________________Incidents and concerns closed or transferred____________________________
Privacy and registration lead__________________Data secured and follow-up assigned____________________________
Finance owner__________________Reconciliation complete or exceptions assigned____________________________
Accountable sponsor__________________Lessons and next-event decision accepted____________________________

Derivative review and release checklist

Review decision: Accept for local completion / Return for revision / Reject Reviewer, date and comments: ____________________________________________________________