Rotary District 9510
REVIEW EDITION
F02 configured supporting document

Volunteer Roster Template

A controlled, editable working derivative for M-T1-CP-24-SD-02. Complete local facts, approvals and operational evidence before use.

Release truth. This file is configured for substantive review. It is not approved for public distribution or operational use. Local law, insurance, safeguarding, accessibility, privacy, brand, rights and accountable-owner checks remain mandatory.

M-T1-CP-24-SD-02 — Volunteer Roster Template

Release control

Controlled fieldControlled value
StatusREVIEW — configured derivative; not approved for operational release
Supporting-document codeM-T1-CP-24-SD-02
Exact derivative titleVolunteer Roster Template
Source initiativeM-T1-CP-24 - Rotary Outdoor Information Stall
Source initiative codeM-T1-CP-24
Source initiative titleRotary Outdoor Information Stall
Initiative dispositionAbsorbed as overlay
Canonical parentM-T1-CP-14 - Pop-Up Rotary Activation System
Canonical parent code and titleM-T1-CP-14 - Pop-Up Rotary Activation System
Named overlay or migration labelOutdoor Market or Festival Stall
Redirect or tombstone routePermanent overlay alias from M-T1-CP-24 to M-T1-CP-14; retain M-T1-CP-24-SD-02 as the stable outdoor-stall overlay asset code
Production familyF02 — People, Roster and Safety
Family masterPlaybook_F02_People_Roster_Safety_Master.md
Family master version1.0, issued 1 August 2026
Index authorityPlaybook Supporting Documents Master Index v1.1, issued 2 August 2026
Family / master versionF02 / 1.0
Recorded master SHA-256e9c57df5391e7774a9c00b8ac8ca21906d0c5c2f1e87592601079309620a9b74
Authoritative indexPlaybook_Supporting_Documents_Master_Index.md v1.1
Configured master variantF02 Section 20 — M-T1-CP-24-SD-02 Outdoor Market or Festival Stall roster overlay
Derivative version0.1
Release statusREVIEW — initiative-configured working derivative; local approval required before operational release

Adaptation note: This is the Outdoor Market or Festival Stall roster overlay for the Pop-Up Rotary Activation System. It requires setup/pack-down leads who know organiser conditions and anchoring, continuous shift authority, accurate project conversation coverage, a data custodian, relief that avoids lone public/data/equipment duty, asset custody at every handover, outdoor task rotation, weather shutdown triggers and buddy arrangements for early and late work.

This roster is not a legal, safety, safeguarding or insurance determination. Confirm event-organiser, venue, jurisdiction, insurer, privacy and emergency requirements for the actual stall before use.

1. Instructions

  1. Complete one roster for each event occurrence and link it to the approved stall setup checklist and organiser conditions.
  2. Include setup, opening, public operation, break, handover, close, site sweep and asset-return periods.
  3. Verify role competence and briefing before assignment; assign an accepted alternate to every critical function.
  4. Rotate standing, sun, wind, noise and high-contact duties, with planned relief and water.
  5. Keep contact details, adjustments, screening and incident information in the restricted internal record, never the public duty list.
  6. Transfer device, paper form, cash, key and asset custody explicitly at every shift change.

2. Controlled stall fields

FieldEntry
Host event / organiser______________________________
Occurrence code / date______________________________
Location / stall number______________________________
Access and setup window______________________________
Public operating hours______________________________
Close / site-clear deadline______________________________
Event lead / alternate______________________________
Roster lead______________________________
Setup / pack-down leads______________________________
Shift lead(s)______________________________
Safety / first-aid contact______________________________
Safeguarding contact______________________________
Data custodian______________________________
Asset handover owner______________________________
Organiser control contact______________________________
Related F01 / F05 records______________________________

3. Outdoor-stall gate

GateApproved condition / evidenceOwnerComplete
Organiser terms, footprint, access and site-clear requirements________________________________________________[ ]
Shelter, weights, furniture, signage, power and equipment controls________________________________________________[ ]
Weather source and shutdown/evacuation triggers________________________________________________[ ]
Public flow, accessibility and emergency route________________________________________________[ ]
First aid, safeguarding, conduct and incident routes________________________________________________[ ]
Approved project facts, next steps and referral boundaries________________________________________________[ ]
Data notice, paper/device custody and retention________________________________________________[ ]
Early setup / late pack-down travel and buddy arrangements________________________________________________[ ]
Insurance, organiser and venue approvals________________________________________________[ ]

Gate decision / reviewer / date: ______________________________________________

4. Required roster pattern

FunctionRequired controlPrimaryAlternate / relief
Setup lead and pairOrganiser access, anchoring, footprint and asset plan____________________________________
Shift leadWeather, public flow, emergency and organiser contacts____________________________________
Conversation hostsAt least one accurately briefed host for each current project/next step____________________________________
Data custodianApproved paper/device enquiry route and secure handover____________________________________
Relief hostKeeps stall staffed without one person carrying public, data and equipment duties alone____________________________________
Asset handover ownerDevices, forms, cash, keys, signs, equipment and return____________________________________
Pack-down lead and pairShutdown, site sweep, organiser handback and safe departure____________________________________

5. Controlled internal roster

Shift / periodVolunteer ID / preferred nameRoleStartFinishBriefingShift leadPlanned breakReliefContact statusAdjustment flag onlyHandover toSign-onSign-off
Setup__________________Setup / asset control____________________________________________________________Confirmed / PendingRestricted / None__________________[ ][ ]
________________________Shift lead____________________________________________________________Confirmed / PendingRestricted / None__________________[ ][ ]
________________________Conversation host____________________________________________________________Confirmed / PendingRestricted / None__________________[ ][ ]
________________________Data custodian____________________________________________________________Confirmed / PendingRestricted / None__________________[ ][ ]
________________________Relief host____________________________________________________________Confirmed / PendingRestricted / None__________________[ ][ ]
Pack-down__________________Pack-down / handback____________________________________________________________Confirmed / PendingRestricted / None__________________[ ][ ]

6. Coverage check

Critical functionSetupOpeningPeakBreak reliefClose/pack-downBackup accepted
Shift authority__________________________________________________________________________________________[ ]
Weather/site monitoring__________________________________________________________________________________________[ ]
Public conversations/current project facts__________________________________________________________________________________________[ ]
Data/forms/device custody__________________________________________________________________________________________[ ]
Safety/first aid/safeguarding__________________________________________________________________________________________[ ]
Asset/site handback__________________________________________________________________________________________[ ]

7. Briefing checklist

8. Shift and asset handover

Date/timeOutgoing leadIncoming leadPeople/break statusWeather/siteDevices/formsCash/keys, if anySigns/equipment/assetsFollow-up actionsAccepted
__________________________________________________________________________________________________________________________________________________________[ ]

9. Public duty list

Use preferred names and public roles only.

TimePublic rolePreferred nameStall positionAsk this person about
______________________________________________________________________________
______________________________________________________________________________

10. Break, rotation and actual-shift record

Volunteer IDExposure/taskPlanned rotation or breakReliefActual timeAdjustment or concern referenceShift-lead check
__________________Standing / sun / wind / noise / public / other______________________________________________________None / ____________________________
__________________Standing / sun / wind / noise / public / other______________________________________________________None / ____________________________

11. Close-out and REVIEW approval

Approval roleNameDecisionDateEvidence
Roster/asset lead__________________Reconciled / Return for action____________________________
Safety/data reviewer__________________Controls accepted / Conditions____________________________
Event lead / organiser handback__________________Approved / Not approved____________________________

Until approved, this derivative remains REVIEW.